Solar for a shed, workshop, allotment or garden office
The step up from a basic DIY kit: a stand-alone solar system to run a garden office or workshop. Covers loads and winter sizing, choosing 12, 24 or 48 V, an example 24 V system, power tools, mounting panels on light structures, battery placement, wiring and earthing the AC side, combining with the mains, and the planning and electrical rules in the UK, USA and Australia.
By Michael Johnson · Updated 16 November 2026 · How we check our guides
This guide is the step up from our DIY solar kit guide: a stand-alone solar system big enough to run a garden office, workshop, allotment shed or cabin, with lights, laptops, a small fridge and power tools. It covers sizing for real winter sun, choosing 12, 24 or 48 V, mounting panels on light structures, wiring a shed like a small house, earthing, and the planning and electrical rules in the UK, USA and Australia.
1. What will you run?
| Load | Power | Typical daily energy |
|---|---|---|
| LED lighting (4–6 fittings) | 30–60 W | 0.1–0.3 kWh |
| Laptop and monitor, 8 hours | 60–120 W | 0.5–1.0 kWh |
| Router or mobile hotspot | 10–20 W | 0.2–0.5 kWh |
| Small fridge | 50–100 W running | 0.3–0.6 kWh |
| Kettle, 3 boils | 2,000–3,000 W | 0.2–0.3 kWh |
| Power tools (saw, drill, sander), 1 hour | 500–2,000 W | 0.5–1.5 kWh |
| Electric heater (1 kW), 6 hours | 1,000 W | 6 kWh: not practical on solar in winter |
Heating is the deal-breaker. A garden office heated electrically needs a mains supply or a different heat source; see the diesel heater guide and the wood burner guide. Add up your own loads with the power consumption calculator.
2. 12, 24 or 48 V?
| System voltage | Suits | Why |
|---|---|---|
| 12 V | Up to about 1–1.5 kW of inverter and 400–600 W of panels | Simple, lots of 12 V kit; but currents get very high (a 2 kW inverter draws about 190 A) |
| 24 V | About 1.5–3 kW inverter and up to about 1.5 kW of panels | Half the current of 12 V, cheaper cable and fuses |
| 48 V | 3 kW and above, or long cable runs | A quarter of the current of 12 V; most larger inverter-chargers and server-rack batteries are 48 V |
Note that 48 V systems are still extra-low voltage (under 120 V DC) but can deliver huge fault currents. Australian rules require a licensed electrician for anything above 120 V DC, which a series string of solar panels often exceeds; see section 11.
3. An example system
| Part | Example | Notes |
|---|---|---|
| Panels | 3 × 400–450 W household panels in series | Check the string's cold-weather Voc stays below the controller limit with the MPPT string voltage calculator |
| Charge controller | MPPT, 150 V input, 60 A output (24 V) | Takes up to about 1.7 kW of panels at 24 V |
| Battery | 24 V 200 Ah LiFePO4 (5.1 kWh) with BMS | About 4.5 kWh usable; check with the battery bank size calculator |
| Inverter-charger | 3 kVA (about 2.4 kW) pure sine, 24 V | Runs a saw or kettle; charges from a generator or mains in winter |
| DC protection | Class T or MRBF fuse at the battery; fuses for each circuit; DC isolator | See the fuse size calculator and DC cable size calculator |
| AC side | Small consumer unit with main switch, 30 mA RCD protection, MCBs or RCBOs | Installed and tested by a qualified electrician (section 8) |
4. Sizing for winter
- Solar output in winter is a fraction of summer. A 1.2 kW array in central England might give about 4–5 kWh a day in June but only 0.5–1 kWh in December. In southern Australia or the southern US, winter output is perhaps a third to a half of summer.
- Decide whether the system must work all year on solar alone, or whether a mains charger or generator tops it up in winter. All-year solar in the UK means a much bigger array, a smaller load, or both.
- Tilt panels steeper (around 50–60° in the UK) to favour winter sun; see the solar panel tilt angle calculator.
- Check your site's monthly output with the solar panel output calculator, and the month-by-month tables in the DIY solar kit guide and off-grid solar system guide.
5. Power tools and big loads
- Motors draw a big surge at start-up: a circular saw or compressor may need 2–3 times its running power for a moment. Choose an inverter whose surge rating covers it.
- Battery-powered (cordless) tools are often the better choice: charge the batteries from the inverter during sunny hours.
- Welders, large compressors and table saws are best run from a generator or the mains.
- Size the inverter with the inverter size calculator, and check battery current with the inverter battery current calculator.
6. Mounting panels on sheds and in gardens
- Is the roof strong enough? A 400 W panel weighs about 20–25 kg, plus mounting rails, and wind can lift panels with surprising force. Many sheds have thin roof boards; fix into the structural timbers, or add rafters.
- Ground mounts on posts or ballasted frames are easier to angle, clean and keep secure, and avoid putting holes in a shed roof.
- Fire: keep DC cables protected, use proper solar connectors (the same make on both halves), and don't run cables loose over timber or felt.
- Shade: one shaded panel in a series string can drag down the whole string. Check winter shade from trees and fences, when the sun is low.
- Wind: use the panel maker's clamp zones and the rail maker's spacing for your wind zone.
7. Where the battery goes
- Inside the shed, in a ventilated, dry place, protected from frost (most LiFePO4 can't be charged below 0 °C) and from heat above about 45 °C.
- On a non-combustible surface or in a steel cabinet, away from flammable materials, fuel cans and the workbench.
- Not where it could be hit by tools, wheelbarrows or a car.
- Fit a smoke or heat alarm in the shed (a linked one that sounds in the house is ideal). See the lithium battery safety guide.
8. Wiring the shed: the AC side
- Once an inverter supplies fixed sockets and lights, it's an electrical installation. Use a small consumer unit with a main switch and 30 mA RCD protection on every circuit.
- Many inverters have a floating neutral when not connected to the mains, so an RCD can't work until the neutral is bonded to earth. Many inverter-chargers do this automatically (a "ground relay") when they're running off battery; check yours, and have an electrician confirm the earthing arrangement.
- Use proper cable sizes and fittings rated for damp locations; outdoor sockets need weatherproof (IP-rated) enclosures.
- Have the installation tested and certified. In the UK, that means an Electrical Installation Certificate; in Australia, a certificate of compliance; in the US, an inspection under a permit.
9. Earthing a stand-alone system
- A stand-alone system has no connection to the network's earth, so it needs its own earth electrode (an earth rod) connected to the inverter's earth and the shed's consumer unit. This is a TT-type arrangement in UK and Australian terms.
- Metal panel frames and mounting structures are bonded to earth as the standards require.
- Where a shed also has a mains supply from the house, an electrician will normally make the shed a separate TT installation with its own rod, rather than extending a house PME earth to an outbuilding, because of the risks on a PME supply.
- Earthing design is the electrician's call, not a DIY decision.
10. Combining with a mains supply
- Charger only: a mains socket feeding the inverter-charger's AC input, so it charges the battery in winter. The shed's fixed wiring stays powered by the inverter. Simple, and it doesn't export anything.
- Grid-connected or hybrid: if the inverter can push power back into the house wiring, it's a grid-connected generator. In the UK it needs G98 or G99 notification to the network operator, in the US an interconnection agreement, and in Australia network approval and AS/NZS 4777 compliance. That's a job for an accredited installer.
- Plug-in solar (England): changes to planning rules in August 2026 recognise plug-in solar that connects through a standard socket. Only use products and connections that meet the current UK rules and the manufacturer's instructions.
- For whole-house backup, see the home backup power guide.
11. Planning and electrical rules by country
| UK | USA | Australia | |
|---|---|---|---|
| Planning | England: solar on houses and outbuildings in a house's grounds is usually permitted development, with limits on stand-alone (ground) arrays and in conservation areas and on listed buildings. The rules for houses changed on 27 August 2026 (SI 2026/896), with a 12-month transition; check the Planning Portal. Wales, Scotland and Northern Ireland have their own rules | Zoning rules for accessory structures and ground-mounted arrays (setbacks, height); HOA rules may apply, though many states limit HOA bans on solar | Council rules; many states treat small rooftop solar and some sheds as exempt or complying development within set limits (for example NSW exempt development rules) |
| Electrical rules | BS 7671 (IET Wiring Regulations), including Section 712 (PV) and Section 551 (generating sets); MCS for grid-connected systems claiming export payments | NEC Article 690 (PV), 706 (energy storage), 710 (stand-alone systems), 480 (batteries); UL-listed equipment | AS/NZS 4509.1 (stand-alone power systems), AS/NZS 5033 (PV arrays), AS/NZS 5139 (batteries), AS/NZS 3000 (wiring rules) |
| Who can do the work | England and Wales: Part P applies to installations in dwellings and in outbuildings supplied from them; new circuits are notifiable, normally through a registered electrician. Work must meet BS 7671 whoever does it. A stand-alone extra-low-voltage system is less regulated, but its mains-voltage side should still be installed and certified properly | Electrical permit and inspection in most jurisdictions; some allow homeowners to do their own work with a permit | Any work above 50 V AC or 120 V ripple-free DC must be done by a licensed electrician (state licensing laws). Mechanical work, like fixing panels and racks, isn't electrical work |
| Allotments and rentals | Allotment tenancy rules often limit structures and equipment; ask the council or association. Tenants need landlord consent | Community garden and lease rules | Community garden and lease rules; council approval for structures |
12. Security, damp and maintenance
- Panels and batteries are targets for thieves. Use anti-theft bolts, lockable cabinets and record serial numbers. Tell your insurer about the equipment.
- Sheds get damp. Keep electronics off the floor and away from walls with condensation; a small dehumidifier or ventilation helps.
- Check connections for heat and corrosion every 6–12 months; re-torque battery and busbar bolts to the maker's figures.
- Clean panels if they get dirty (bird droppings, tree sap), and trim back trees in autumn.
- Check the battery's BMS app or monitor for cell imbalance and low winter state of charge.
13. Approximate costs
| System | UK | USA | Australia |
|---|---|---|---|
| 12 V, 400 W panels, 1.3 kWh battery, 1 kW inverter (parts) | £900–1,500 | $900–1,600 | A$1,500–2,500 |
| 24 V, 1.2 kW panels, 5 kWh battery, 3 kVA inverter-charger (parts) | £2,500–4,000 | $2,500–4,500 | A$4,000–6,500 |
| Electrician for AC side and testing | £300–900 | $500–1,500 plus permit | A$500–1,500 |
Rough 2026 prices; they vary widely.
14. Frequently asked questions
Can I run a garden office on solar power all year?
In sunny climates, yes for lights, computers and a small fridge. In the UK, winter solar output is so low that most garden offices also need a mains charger or generator, and electric heating is impractical on solar.
Do I need planning permission for solar panels on my shed?
In England, panels on outbuildings within a house's grounds are usually permitted development, but limits apply to stand-alone arrays, conservation areas and listed buildings, and the rules for houses changed in August 2026. Check the Planning Portal or your council. US and Australian rules depend on your local council or zoning.
Is 12 V or 24 V better for a shed solar system?
12 V suits small systems up to about 1 kW of inverter. For anything bigger, 24 V or 48 V halves or quarters the current, making cables, fuses and connections cheaper and safer.
Can I wire my shed's sockets myself?
In Australia, no: work above 50 V AC or 120 V DC needs a licensed electrician. In the UK, the work must meet BS 7671 and new circuits in outbuildings supplied from a house are notifiable under Part P in England and Wales. In the US, most areas require a permit and inspection.
Does a stand-alone solar shed need an earth rod?
Usually yes, once it supplies mains-voltage sockets: there's no network earth, so the system needs its own earth electrode connected to the inverter and consumer unit. An electrician should design and test it.
15. Sources
- Planning Portal, changes to permitted development rules for domestic solar (August 2026): planningportal.co.uk
- UK legislation, General Permitted Development Order 2015, Schedule 2 Part 14: legislation.gov.uk
- IET, Part P (England and Wales) frequently asked questions: theiet.org
- Government of Western Australia, renewable energy systems and electrical licensing factsheet (2024): wa.gov.au
- Standards Australia, AS/NZS 4509.1 stand-alone power systems: standards.org.au
- Australian Government ABLIS, AS/NZS standards for solar PV systems: business.gov.au
General guidance only. Mains-voltage wiring must be installed and tested by a qualified or licensed electrician in line with the rules where you live.