Home backup power: generators, batteries and safe connection
How to keep the fridge, boiler, lights and pumps running when the grid goes down, without endangering line workers. Covers portable and standby generators, home batteries and solar backup, changeover and transfer switches, interlocks, earthing and the neutral, and the rules in the UK, USA and Australia.
By Michael Johnson · Updated 16 November 2026 · How we check our guides
1. Why backfeeding kills
When the grid goes down, the cables in your street are dead, and engineers work on them as dead cables. Your meter and the local transformer work in both directions. A 230 V or 120/240 V generator connected into a house circuit without isolation pushes power out through the meter, and the pole or substation transformer steps it back up to thousands of volts on the high-voltage side. A small portable generator can make a "dead" line lethal.
- It endangers others. Utility crews, your neighbours, and anyone touching a fallen cable.
- It destroys equipment. When the grid returns, the generator is suddenly connected to a supply that is out of phase with it. The generator can be wrecked and wiring can overheat.
- It's a fire risk at the plug. A socket circuit is protected for 20–32 A of load, not for the generator's full output fed back through it, and a double-ended lead has live, exposed pins.
- It's illegal and uninsurable. All three countries require a fixed, isolating connection fitted by a licensed or qualified electrician.
2. Your backup options compared
| Option | What it powers | Switch-over | Pros | Cons |
|---|---|---|---|---|
| Portable generator + extension leads | Individual appliances plugged straight into the generator | Manual | Cheapest, no wiring work, legal everywhere | Leads through windows or doors, no fixed loads (boiler, well pump, hard-wired lights) |
| Portable generator + inlet + changeover switch or interlock | Chosen circuits or the whole house within the generator's rating | Manual, 1–5 minutes | Runs hard-wired loads like boilers, furnaces and pumps; the best value for most homes | Needs an electrician; generator must be wheeled out and started |
| Automatic standby generator | Whole house or essential loads | Automatic, 10–30 seconds | Hands-off; runs on mains gas, LPG or diesel for days | Expensive; needs a fixed site, fuel supply and maintenance contract |
| Home battery with backup gateway | Essential loads or whole house | Automatic, usually under 1 second (some in milliseconds) | Silent, no fumes, recharges from solar; also saves money every day | Limited energy (typically 5–15 kWh); not every battery system does backup |
| Portable power station | A few appliances plugged into it | Manual, or UPS-style pass-through | Silent, indoor-safe, no installation | Small capacity, 0.5–3 kWh typical |
| UPS | Router, computer, alarm panel, medical device | Instant | Bridges short cuts with no interruption | Minutes to an hour or two only |
See also the portable power station guide, the generator guide and the power outage plan.
3. What to keep running
Write a list of what you actually need in a cut, not everything in the house. Motors (fridges, freezers, pumps, air conditioners) draw a short surge of 2 to 7 times their running power when they start. That start-up surge, not the running total, usually decides the generator size.
| Load | Running power (typical) | Start-up surge (typical) | Notes |
|---|---|---|---|
| Fridge-freezer | 100–200 W | 600–1,200 W | Runs about a third of the time; inverter-compressor models start softly |
| Chest freezer | 60–120 W | 400–800 W | Stays frozen for 1–2 days if kept shut |
| Gas boiler (UK, AU) or gas furnace blower (US) | 80–150 W boiler; 300–800 W furnace blower | Up to 2× running | Most need a proper neutral–earth reference to detect the flame (section 6) |
| Well pump, ¾–1 hp (common in rural US and AU) | 750–1,100 W | 2,500–4,500 W | Often 240 V in the US; needs a 240 V generator output |
| Sump pump, ⅓–½ hp | 400–800 W | 1,300–2,200 W | Critical in flood-prone basements |
| Router, fibre box, phone charging | 15–40 W | – | Run from a small UPS or power station |
| LED lighting | 5–10 W per lamp | – | |
| CPAP or oxygen concentrator | 30–100 W CPAP; 300–600 W concentrator | – | See the CPAP battery calculator |
| Microwave (800–1,000 W rated) | 1,200–1,500 W input | – | Rated power is output; input is higher |
| Kettle | 2,000–3,000 W (230 V), 1,500 W (120 V) | – | Use one big load at a time |
| Window or portable air conditioner | 500–1,500 W | 1,500–3,500 W | Inverter types start gently |
| Central air conditioning, 3 ton (US) | 3,000–4,000 W | Locked-rotor current often 80–100 A | Usually needs a soft-starter to run on a generator |
| Electric shower, oven, storage or resistance heating | 3,000–10,500 W | – | Normally left off on backup power |
Add up your own list with the power consumption calculator. The surge figures above are typical; your appliance's rating plate or manual gives the real numbers.
4. Sizing a generator or battery
Generator: power
- Add the running watts of everything that may run together.
- Find the single largest start-up surge, and add the extra it draws above its running power (surge minus running).
- The generator's continuous rating must cover step 1, and its peak (surge) rating must cover step 1 plus step 2.
- Keep the continuous load to about 70–80% of the continuous rating. Generators run cooler, last longer and hold voltage better with headroom.
Example: fridge-freezer 150 W + chest freezer 100 W + gas boiler 120 W + router and lights 80 W + TV 100 W = 550 W running. Largest surge: fridge-freezer 1,200 W, which is 1,050 W above running. Peak needed ≈ 550 + 1,050 = 1,600 W. A 2.0–2.2 kW inverter generator covers this with room for a kettle used on its own.
Check your own numbers with the generator size calculator, then estimate fuel with the generator fuel consumption calculator.
Battery: energy
- Battery size is about energy (kWh) over time, not just power. A fridge averaging 1.2 kWh a day, a boiler 1 kWh, lights and router 0.6 kWh gives about 2.8 kWh a day.
- Usable capacity is usually 90–100% of the label for lithium (LiFePO4), less in cold weather. A 10 kWh battery with that load lasts about three days with no sun.
- The inverter must also handle the surge. Many home battery inverters supply 3–7.6 kW continuous in backup, and some much less on an "EPS" socket.
- Use the battery bank size calculator and the UPS runtime calculator to check runtime.
Voltage and phases
- UK and Australia: single-phase 230 V, 50 Hz. Three-phase homes need either a three-phase generator or a changeover that transfers only the chosen phase's circuits.
- USA: split-phase 120/240 V, 60 Hz. A generator with only 120 V outlets can't run 240 V loads (well pumps, many furnaces with 240 V blowers, electric dryers). For a transfer switch or interlock, choose a generator with a 240 V twist-lock outlet (NEMA L14-30 or 14-50).
5. The three safe ways to connect
A. Manual changeover (transfer) switch with a generator inlet
- A changeover switch has three positions: mains, off, generator (often marked I–0–II). It breaks one supply before making the other, so the two can never be connected together.
- It is fitted between the meter and the consumer unit for the whole house, or feeds a small "essential circuits" board.
- The generator plugs into a weatherproof inlet on the outside wall: a male socket, so the pins are never live when nothing is plugged in. UK and Australian inlets are usually the blue 16 A or 32 A industrial type (BS EN 60309 / IEC 60309). US inlets are usually NEMA L14-30 (30 A) or CS6375 / 14-50 (50 A).
- The switch must switch every live conductor, including the neutral where the earthing arrangement needs it (section 6).
- A sub-panel transfer switch (common in the US) moves 6–10 selected circuits across instead of the whole house.
B. Interlock kit (US)
- A sliding or hinged plate on the main panel that makes it impossible to turn on the generator backfeed breaker unless the main breaker is off.
- NEC 702.5 accepts it as transfer equipment provided it is listed for that panel. A generic "universal" plate that isn't listed for your panel may fail inspection.
- The generator backfeed breaker must be secured with a hold-down kit, and the inlet should be close to the panel.
- Cheaper than a transfer switch and lets you choose any circuits, but you must manage the load yourself so you don't overload the generator.
- Interlock plates are not a recognised method in the UK or Australia; use a changeover switch there.
C. Automatic transfer switch (ATS) and standby generators
- Senses the grid failing, starts the generator and transfers the load after a short delay; switches back and lets the generator cool down when the grid returns.
- US: whole-house ATS must be sized for the full calculated load or use load management (NEC 702.4). Load-shedding modules switch off air conditioners or water heaters automatically.
- Standby generators need a concrete or composite pad, clearances to openings and combustibles set by the manufacturer and local codes (typically about 1.5 m / 5 ft from openings), and gas pipework sized for the generator.
Fitting the inlet and switch: who can do it
| UK | USA | Australia | |
|---|---|---|---|
| Who may fit it | A competent electrician; in England and Wales usually notified under Building Regulations Part P. Work on the meter tails may need the network operator to remove the cut-out fuse. | A licensed electrician, with a permit and inspection in almost every jurisdiction. Some states allow homeowners to do their own wiring with a permit. | A licensed electrician only, who must give you a certificate of compliance (name varies by state). DIY electrical work is illegal. |
| Main rule | BS 7671 Section 551.6 | NEC Article 702 | AS/NZS 3000 Section 7.3 and AS/NZS 3010 |
6. Earthing and the neutral
This is the most misunderstood part of backup power, and it causes two common faults: RCDs or GFCIs tripping, and gas boilers or furnaces refusing to light.
- Why it matters. RCDs/GFCIs and flame-sensing circuits in boilers expect the neutral to be connected to earth at one point. Many portable generators have a "floating" output (neutral not connected to the frame), and others are "bonded" (neutral joined to the frame).
- If the transfer equipment does not switch the neutral (common in the US with interlocks and most transfer switches), the house neutral stays joined to earth at the main panel. The generator should then have a floating neutral, or you get two neutral–earth bonds and a parallel path that trips GFCIs and RCDs.
- If the transfer equipment switches the neutral (UK practice, and some US transfer switches marked "switched neutral"), the generator becomes a separate source. It then needs its own neutral–earth bond and a proper earth, so a bonded-neutral generator, or a bonding plug fitted by your electrician.
- UK, PME (TN-C-S) supplies. Most UK homes use the network operator's neutral as their earth. During a cut the house may still be connected to that earth terminal. The changeover must switch the neutral, and your electrician will decide whether the generator needs its own earth electrode. BS 7671 Section 551 requires protection by automatic disconnection to work with the generator as the source, which a 30 mA RCD normally provides.
- Australia, MEN system. The neutral–earth link is at the main switchboard. AS/NZS 3010 sets how the generator's own earthing and RCD protection must be arranged when it supplies the installation. Leave this to the electrician who fits the changeover.
- Boilers and furnaces. If a boiler or furnace locks out with "flame failure" on generator power but works on mains, a missing neutral–earth reference is the most likely cause. Ask your electrician to correct it; don't improvise a bonding plug on a system you haven't had checked.
- US portable generators used on their own. NEC 250.34 says a portable generator only feeding equipment plugged into its own outlets doesn't need a ground rod. Since the 2020 NEC, outlets on portable generators of 15 kW or less must have GFCI protection (445.20).
7. Solar panels and home batteries in a power cut
- Ordinary grid-tied solar shuts down in a cut. Grid-tied inverters must switch off within a fraction of a second when the grid fails, so they don't backfeed the network (anti-islanding). Panels on the roof give you no power in a cut unless the system was designed for backup.
- Backup needs isolating hardware. A backup gateway, "EPS" (emergency power supply) circuit or automatic changeover disconnects the house, or a sub-board, from the grid before the battery and solar restart. Only then can the solar recharge the battery during a long cut.
- EPS socket versus whole-home backup. Some batteries only power one dedicated socket or a small sub-board (often 3 kW or less). Whole-home systems can run everything within their power rating. Check before you buy: "backup ready" may mean extra hardware.
- AC-coupled versus hybrid. A hybrid inverter connects the panels and the battery together and can usually recharge from solar off-grid. An AC-coupled battery added to existing solar needs the solar inverter to work with the battery's frequency control during a cut; not every pairing does.
- Generator with a battery. Many hybrid inverters accept a generator input and use it to recharge the battery. That gives long backup with short generator runs. Some inverters must not have a generator connected to their backup output. Follow the inverter manual.
- Where the battery goes. Each country restricts battery locations in homes (UK PAS 63100, US NFPA 855/IRC R328, Australia AS/NZS 5139). See the lithium battery safety guide.
8. United Kingdom rules
| Topic | Rule or guidance |
|---|---|
| Wiring Regulations | BS 7671 (IET Wiring Regulations) Section 551 covers low-voltage generating sets. Regulation group 551.6 applies where a generator is a switched alternative to the mains: precautions must stop it running in parallel with the network, such as a three-position break-before-make changeover switch, mechanically or electrically interlocked switches, or a single transferable key system. |
| Prosumer installations | BS 7671 Chapter 82 (added in Amendment 2, 2022) covers installations with their own generation and storage, including "island mode" operation during a grid outage. |
| Generators running in parallel | Any generator or battery inverter that can run connected to the grid (not just as a switched alternative) needs the network operator's acceptance under Engineering Recommendation G98 (up to 16 A per phase, notify after fitting) or G99 (larger, apply before fitting). Home batteries with backup fall under these. |
| Building Regulations | In England, Part P: adding a new circuit or working on the consumer unit is notifiable, normally through a registered competent-person scheme electrician. Wales has similar rules; Scotland uses building warrants and BS 7671 through the technical handbooks; Northern Ireland has its own regulations. |
| Meter tails | Fitting a whole-house changeover between meter and consumer unit means isolating the supply at the cut-out. Only the network operator, or someone they authorise, may remove the cut-out fuse or seal. |
| Battery location | PAS 63100:2024 sets out where home batteries may and may not go (not in bedrooms, escape routes, lofts or voids) and capacity limits of about 40 kWh indoors and 80 kWh outdoors. |
| Carbon monoxide | Never run a generator indoors, in a garage or under a closed porch. Use a CO alarm to BS EN 50291 in the home. Since 2022, landlords in England must fit CO alarms in rooms with fixed combustion appliances (except gas cookers). |
| Fuel storage | Petroleum (Consolidation) Regulations 2014: you can store up to 30 litres of petrol at home without telling the petroleum enforcement authority, in suitable containers (plastic up to 10 L each, metal up to 20 L each). |
9. United States rules
| Topic | Rule or guidance |
|---|---|
| National Electrical Code | Article 702 (optional standby systems) applies to home backup generators. 702.5 requires transfer equipment that prevents inadvertent interconnection of the normal and standby sources. Interlocks must be listed for the panel. 702.4 covers capacity: a manual system must supply all loads intended to run at once; an automatic system must supply the full load or use load management. |
| Signs | 702.7: a permanent sign at the service equipment showing the type and location of the standby source; power inlets need a warning label too. |
| Generators | Article 445: disconnecting means, overcurrent protection and, for one- and two-family dwellings, an emergency shutdown outside the house for permanently installed generators (445.19(C) in the 2023 NEC). GFCI on portable generator outlets (445.20). Grounding: 250.30 and 250.34. |
| Batteries and solar | Article 706 (energy storage systems), 705 (interconnected sources), 710 (stand-alone systems). Equipment listed to UL 9540 (ESS) and UL 1741 (inverters). Location limits in NFPA 855 and IRC R328: typically 20 kWh per unit, 40 kWh in utility rooms and basements, 80 kWh in garages and outdoors; never in sleeping rooms or closets opening into them. Check your state's adopted edition. |
| Permits | Your city or county building department enforces the NEC edition your state adopted (2017, 2020 or 2023, and some states already 2026). Transfer switches, inlets and standby generators need an electrical permit; gas lines need a plumbing or fuel-gas permit. |
| Utility rules | Utilities prohibit backfeeding in their tariffs and can disconnect service. Battery systems that connect in parallel need an interconnection agreement. |
| Carbon monoxide | CPSC: run portable generators outside only, at least 20 feet (about 6 m) from the house, with the exhaust pointing away; about 100 people a year die from generator CO poisoning. Generators certified to ANSI/PGMA G300-2018 or UL 2201 have CO shut-off or low-emission features that sharply cut the risk. Most states require CO alarms in homes with fuel-burning appliances or attached garages. |
| Emissions | EPA small engine rules apply nationally. California's CARB rules phase out new gasoline small off-road engines, with portable generators affected from 2028; see the generator guide. |
| Fuel | Local fire codes typically limit stored gasoline in a home or attached garage (often 25 US gallons in approved containers); use containers meeting ASTM F852 with child-resistant closures. |
| Tax credits | The federal 25D residential clean energy credit for batteries and solar ended for systems placed in service after 2025. Some states and utilities still offer battery incentives. |
10. Australia rules
| Topic | Rule or guidance |
|---|---|
| Who can connect | Only a licensed electrician may connect a generator to house wiring, by fitting a changeover switch (and an inlet if needed) so the generator and network can never supply the house at the same time. They must give you a certificate of compliance. Severe penalties apply to non-compliant work. |
| Standards | AS/NZS 3000 (Wiring Rules) Section 7.3 covers alternative supplies and refers to AS/NZS 3010 (generating sets). AS/NZS 3010 also covers portable generators, their outlets and RCD or electrical-separation protection. Generator outlets should be standard 10/15 A AS/NZS 3112 type. |
| Portable use | Plug appliances directly into the generator with heavy-duty extension leads rated at least as high as the generator, and protect plug joints from rain. Never connect to a power point or switchboard unless an electrician has fitted a dedicated inlet. Worksite generators must have RCD-protected outlets (AS/NZS 3012). |
| Product marking | Generators and leads sold in Australia should carry the RCM (Regulatory Compliance Mark). |
| Batteries and solar | AS/NZS 4777.1 (installation of grid-connected inverters, including backup) and 4777.2 (inverter requirements); AS/NZS 5139 (battery installation and location: not in habitable rooms, ceiling spaces, wall cavities, under stairs or near exits). Network approval is needed before connection. The federal Cheaper Home Batteries Program (from July 2025) discounts eligible batteries. |
| Carbon monoxide | Never run a generator indoors, in a garage or enclosed carport; keep exhaust away from doors, windows and vents. |
| Fuel | Use petrol containers marked AS/NZS 2906. State dangerous-goods laws limit how much fuel you can keep at home; check with your state regulator. |
11. Fuel, runtime and storage
| Generator type | Typical fuel use | Fuel for 24 hours |
|---|---|---|
| 2 kW inverter, petrol, quarter to half load | 0.3–0.6 L/h (0.08–0.16 US gal/h) | 7–15 L |
| 3.5 kW inverter, petrol, half load | 0.7–1.1 L/h | 17–26 L |
| 7 kW open-frame, petrol, half load | 2–3 L/h (0.5–0.8 US gal/h) | 48–72 L |
| 20 kW standby, natural gas, half load (US) | about 5–6 m³/h (about 180–210 ft³/h) | Piped supply |
- Run, then rest. You rarely need the generator all day. Running it for two hours, four times a day keeps fridges and freezers cold, recharges batteries and cuts fuel use by two-thirds.
- Petrol goes stale. Ordinary petrol (especially E10) can start to degrade within a few months. Add fuel stabiliser, rotate stored fuel into your car, or use alkylate fuel (Aspen, Motomix and similar) for long storage.
- Dual-fuel. LPG/propane stores indefinitely and burns cleaner, at the cost of about 10% less power. See the LPG and propane safety guide.
- Refuel cold. Switch off and let the engine cool before refilling; petrol spilled on a hot exhaust can ignite.
12. Carbon monoxide
- Fit battery-powered or battery-backup CO alarms on every level and near bedrooms (UK BS EN 50291-1; US UL 2034; Australia: choose alarms certified to EN 50291 or UL 2034). Test them before storm season.
- Choose a generator with automatic CO shut-off (US: PGMA G300-2018 or UL 2201 certification).
- Symptoms: headache, dizziness, nausea, tiredness, confusion. If several people feel ill at once, get everyone outside and call 999, 911 or 000.
- A generator shed or enclosure must be designed for it, with ventilation and exhaust outside; a garden shed with the door shut is not safe.
13. Testing and maintenance
| When | Task |
|---|---|
| Monthly | Start the generator and run it under load for 20–30 minutes. Standby generators usually exercise themselves weekly; check that they do. |
| Every 3–6 months | Do a full changeover: switch to generator, check that the boiler or furnace, pumps and fridge run, then switch back. Test RCDs or GFCIs on generator power. |
| Yearly, or by hours | Oil and filter change, spark plug, air filter (often every 50–100 hours on portables). Check extension leads and the inlet for damage. |
| Fuel | Rotate stored petrol every 3–6 months, or run it dry and store it empty; drain the carburettor for long storage. |
| Battery systems | Check that backup mode is enabled, firmware is current and a reserve (often 20–30%) is held for outages. Test by switching off the main supply. |
14. Approximate costs
Rough 2026 prices, including installation where relevant. Local labour rates vary widely.
| Item | UK | USA | Australia |
|---|---|---|---|
| 2–3.5 kW inverter generator | £500–1,500 | $500–1,800 | A$800–2,500 |
| Changeover switch and inlet, fitted | £400–1,000 | $1,000–2,500 (transfer switch); $500–1,500 (interlock) | A$800–2,000 |
| Automatic standby generator, installed | £6,000–15,000 | $8,000–20,000 | A$10,000–25,000 |
| Home battery with backup, installed (about 10–13 kWh) | £5,000–10,000 (0% VAT on batteries) | $10,000–18,000 | A$8,000–16,000 before rebates |
15. Frequently asked questions
Can I plug my generator into a wall socket if I switch off the main switch?
No. It is illegal in the UK, US and Australia. Someone can switch the main back on, the double-ended lead has live exposed pins, and the socket circuit isn't protected for that use. Fit an inlet and changeover switch, or use extension leads to individual appliances.
What size generator do I need to run a fridge and freezer in a power cut?
Usually 1,000–2,000 W. A fridge-freezer runs on 100–200 W but needs 600–1,200 W for a second when the compressor starts. A 2 kW inverter generator runs a fridge, a freezer, lights and phone charging comfortably.
Why won't my gas boiler or furnace work on generator power?
Most likely the generator's neutral isn't referenced to earth, so the flame-detection circuit can't see the flame. An electrician can confirm whether your changeover switches the neutral and arrange the correct neutral–earth bond.
Do solar panels work in a power cut?
Not on a normal grid-tied system: the inverter shuts down to protect line workers. You need a battery with a backup gateway or an EPS circuit, or a hybrid inverter designed for off-grid operation.
Is an interlock kit legal?
In the US, yes, if it is listed for your specific panel and installed under a permit; NEC 702.5 accepts it as transfer equipment. In the UK and Australia, use a changeover switch instead.
How far from the house should a generator be?
The US CPSC recommends at least 20 feet (about 6 m), with the exhaust pointing away from the house. UK and Australian authorities say outdoors and well away from doors, windows and vents. More distance is safer.
How long will a home battery run my house?
Divide usable capacity by your load. Essential loads of about 300 W average use 7 kWh a day, so a 13.5 kWh battery lasts about two days, longer if solar recharges it.
16. Sources
- IET, BS 7671 Wiring Regulations, Section 551 (generating sets) and Chapter 82 (prosumer installations): IET Wiring Matters
- BSI, PAS 63100:2024 battery storage in dwellings, summary: Marley
- UK Power Networks, power cuts and low carbon technologies: ukpowernetworks.co.uk
- UK legislation, Petroleum (Consolidation) Regulations 2014: legislation.gov.uk
- EC&M, NEC requirements for generators (Article 445, 2023 NEC): ecmweb.com
- EC&M, NEC requirements for optional standby systems (Article 702): ecmweb.com
- US CPSC, winter safety and portable generator CO deaths (January 2025): cpsc.gov
- UL Solutions, residential ESS separation and maximum quantities: ul.com
- Electrical Safety Office Queensland, permanently connected generators: electricalsafety.qld.gov.au
- Electrical Safety Office Queensland, portable generators: electricalsafety.qld.gov.au
- Government of South Australia, using generators for back-up power: sa.gov.au
- Energy Safe Victoria, generator safety fact sheet (2026): energysafe.vic.gov.au
- Standards Australia, AS/NZS 3010:2017 Electrical installations – Generating sets: standards.org.au
General guidance only. Electrical work on fixed wiring must be done by a qualified or licensed electrician in line with the rules where you live.