Home › Guides › 230 V wiring from an inverter

Wiring a shed or cabin for 230 V from an inverter

Plug-in or fixed wiring, the rules, earthing an inverter supply, RCDs and the consumer unit, cables and sockets, combining with a grid supply, DC loads, and what you can do yourself.

By Michael Johnson · Updated 19 November 2026 · How we check our guides

Once a shed, workshop, cabin or garden office has a battery and inverter, the next step is often proper 230 V sockets and lights instead of extension leads. That means building a small mains electrical installation powered by an inverter, with all the same shock and fire risks as house wiring, plus some extra questions about earthing that don't arise on the grid. This guide explains what's involved, the rules in England and Wales, inverter earthing, RCDs and consumer units, cable and sockets, combining with a grid supply, and what you can do yourself versus what needs an electrician.

230 V can kill. Fixed mains wiring from an inverter is a real electrical installation. It should be designed, installed and tested by a competent person to BS 7671 (the IET Wiring Regulations). If you're not qualified, have an electrician do the AC side and certify it.

1. Options: plug-in or fixed wiring

OptionProsCons
Plug appliances into the inverter's own socketsSimple; no installation workExtension leads everywhere; limited sockets
Fixed wiring from the inverter via a small consumer unitProper sockets and lighting circuits, RCD protectionNeeds correct earthing, design and testing
Low-voltage (12 or 24 V) lighting and USB, with a few 230 V socketsEfficient; less mains wiringTwo systems to install

2. The rules

3. Earthing an inverter supply

4. RCDs and the consumer unit

5. Cables, sockets and lights

6. Combining with a grid supply

7. Keep some things on DC

8. What you can do yourself

9. Frequently asked questions

Can I wire sockets to my inverter in a shed?

Yes, but it's a fixed mains installation. It needs correct earthing, RCD protection and testing, and in England and Wales is usually notifiable building work.

Does an off-grid inverter need an earth?

The installation needs a correct earthing arrangement, usually neutral bonded to earth and an earth electrode, so RCDs work. Follow the inverter manual.

Is running power to a shed notifiable?

In England and Wales, a new circuit to an outbuilding is usually notifiable under Part P. Use a registered electrician.

10. Sources

  1. Voltimum, electrical supply to an outbuilding: voltimum.co.uk
  2. Selectra, power to a shed: cable size and depth: selectra.co.uk
  3. IET, consumer units and protective devices FAQs: theiet.org

New to some of the terms? See the glossary. Not sure where to start? Try start here.